Chapter 90 Contract 13

Includes Chauncy St, Upland Rd (Raymond to Huron), Lowell St, Pemberton St, Henry St

This project has been completed. No further updates to this project page will be made.


Crews are have completed the work on Lowell St and Henry St.

Paving on Chauncy St is scheduled to take place after additional utility work is completed on the street.  We do not have a paving date at this time.

Surface improvementson Lowell St and Henry St are complete.   All work is expected to complete work on all streets by the spring of 2012. 

We do not have a paving date for Chauncy St at this time.  

 

 

 

Chapter 90 contracts are funded by the state and managed by the Public Works Department. They are a major portion of the Engineering Division's five year plan. Construction generally includes surface enhancements such as pavement, sidewalk and pedestrian ramp reconstruction, traffic calming, and greenscaping. Minor stormwater management is also occasionally included.

View this page at www.ma.gov for more information.

 

The project includes:

 

Chauncy Street (Massachusetts Ave to Garden St)

  • New water services (select locations), catch basins, pedestrian ramps, and roadway paving.

 

Upland Road (Raymond St to Huron Ave)

  • New water services (select locations), catch basins, sidewalks, pedestrian ramps, roadway paving.
  • Traffic elements, including a curb extension on Upland Rd at Newell St, and one on Huron Ave at the intersection of Huron and Upland.

 

Lowell Street (Brattle St to Mt. Auburn St)

  • New catch basins, sidewalks, pedestrian ramps, roadway paving.

 

Pemberton Street (Massachusetts Ave to Fairfield St)

  • New sidewalks, pedestrian ramps, roadway paving.

 

Henry Street (Brookline St to Pearl St)

  • New sidewalks, pedestrian ramps, roadway paving.

 

Cambridge Department of Public Works 147 Hampshire Street

rfuentes@cambridgema.gov

Work hours are 7 AM to 4 PM Monday through Friday

 

If you need additional information or assistance related to this work, please contact project manager Hussein Musa at 617.349.4831 or by email at hmusa@cambridgema.gov .

For for accommodations or continuation of special services related to a disability or special need please contact Rebecca Fuentes: 617.349.6948/ rfuentes@cambridgema.gov.

For 24-hour emergency assistance please call 617.349.4800.

Page was last modified on 7/25/2023 3:43 AM
Contact Us

How can we help?

Please provide as much detail below as possible so City staff can respond to your inquiry:

As a governmental entity, the Massachusetts Public Records Law applies to records made or received by the City. Any information received through use of this site is subject to the same provisions as information provided on paper.

Read our complete privacy statement


Service Requests

Enter a service request via SeeClickFix for things like missed trash pickups, potholes, etc.