ROADWAY PAVING NOTICE
Mt. Auburn Street from Gibson Street to Fresh Pond Parkway
November 8, 5 AM until Complete

The city’s contractor, D’Allessandro Corporation, will perform roadway paving on the following streets on Mt. Auburn Street from Gibson Street to Fresh Pond Parkway.  Paving will take place on Sunday, November 8, in preparation for final roadway paving. Work hours for the paving operation will be 5 AM until Complete and street closures and parking restrictions will be in effect.

Due to overhead MBTA wires only being deenergized on Sundays, this severely limits our access to the area and work schedule, requiring the roadway paving and subsequent paving operations to be performed on Sundays.  DPW has coordinated with both the MBTA and the Mount Auburn Hospital ahead of this planned work.

What to Expect During Roadway Paving:

  • Streets will be closed to vehicular traffic during paving operations.
  • During the paving operations, detours and road closures will be in place while crews perform the work. Police details and signage will be onsite to direct drivers.
  • There cannot be any cars parked on the street during the paving operation. Please be sure to check “No Parking” signs to avoid being ticketed and towed.
  • When work occurs directly in front of driveways or entryways, the contractor will coordinate access directly with residents.
  • City services will continue uninterrupted and emergency vehicles will maintain access at all times.
  • Please note that all operations are weather dependent and may be rescheduled.

If you have any questions regarding construction, please contact Dan Riviello, Community Relations Manager, at 617.349.4825 / driviello@cambridgema.gov or Hussein Musa, Project Manager at 617.349.4831 / hmusa@cambridgema.gov.  If you have any special needs or disability, please contact us to arrange for special accommodations that may be necessary.

We apologize in advance for any inconvenience you may experience during this construction, and thank you for your continued patience and understanding.


ROADWAY GRINDING NOTICE
Mt. Auburn Street from Gibson Street to Fresh Pond Parkway
October 25, 5 AM until Complete

The city’s contractor, D’Allessandro Corporation, will perform roadway grinding on the following streets on Mt. Auburn Street from Gibson Street to Fresh Pond Parkway.  Grinding will take place on Sunday, October 25, in preparation for final roadway paving. Work hours for the grinding operation will be 5 AM until Complete and street closures and parking restrictions will be in effect.

Due to overhead MBTA wires only being deenergized on Sundays, this severely limits our access to the area and work schedule, requiring the roadway grinding and subsequent paving operations to be performed on Sundays.  DPW has coordinated with both the MBTA and the Mount Auburn Hospital ahead of this planned work.

What to Expect During Roadway Grinding:

  • Streets will be closed to vehicular traffic during grinding operations.
  • During the grinding operations, detours and road closures will be in place while crews perform the work. Police details and signage will be onsite to direct drivers.
  • There cannot be any cars parked on the street during the grinding operation. Please be sure to check “No Parking” signs to avoid being ticketed and towed.
  • When work occurs directly in front of driveways or entryways, the contractor will coordinate access directly with residents.
  • City services will continue uninterrupted and emergency vehicles will maintain access at all times.
  • Please note that all operations are weather dependent and may be rescheduled.

If you have any questions regarding construction, please contact Dan Riviello, Community Relations Manager, at 617.349.4825/ driviello@cambridgema.gov or Hussein Musa, Project Manager at 617.349.4831 / hmusa@cambridgema.gov.  If you have any special needs or disability, please contact us to arrange for special accommodations that may be necessary.

 

We apologize in advance for any inconvenience you may experience during this construction, and thank you for your continued patience and understanding.


August 2015

During the week of June 29 (weather permitting), the City’s contractor, D’Allessandro Corporation, mobilized to Mt. Auburn Street (Gibson Street to Fresh Pond Parkway) to complete the reconstruction of the center island near the Fresh Pond Parkway. In addition to work in the center island, crews will be performing miscellaneous sidewalk repairs throughout the project area.  Reconstruction of the roadway will begin this month.

The project is scheduled to begin August 2, 2014, and is expected to be completed by late October 2014. Final roadway paving will take place in spring/summer 2015.

The Mt. Auburn Street Reconstruction Project includes:

- Roadway reconstruction

- Sidewalk reconstruction

- Traffic calming measures


 

City of Cambridge Dept. of Public Works 147 Hampshire Street Cambridge, MA 02139

For additional information or assistance, please contact Hussein Musa, project manager, at 617.349.4831.

For 24 hour emergency assistance, please call Public Works at 617.349.4800.


 

Page was last modified on 7/25/2023 3:42 AM
Contact Us

How can we help?

Please provide as much detail below as possible so City staff can respond to your inquiry:

As a governmental entity, the Massachusetts Public Records Law applies to records made or received by the City. Any information received through use of this site is subject to the same provisions as information provided on paper.

Read our complete privacy statement


Service Requests

Enter a service request via SeeClickFix for things like missed trash pickups, potholes, etc.