June 12, 2017
Crews will finish paving any remaining sections of roadway on Mass Ave on Monday, June 12.
_____________________________________________________________________________________________________________________________________________________________
June 5, 2017
Crews are scheduled to pave Mass Ave, between Linnaean St and Upland Rd (both sides), this Sunday, June 11. Work hours will be 7 AM on Sunday to 4 AM on Monday morning, June 12. Vehicular access on Mass Ave will be restricted at times while crews perform the paving. Please plan accordingly.
____________________________________________________________________________________________________________________________________________________________
May 30, 2017
- Crews are scheduled to mill the roadway on Mass Ave, between Linnaean St and Upland Rd (both sides) this Sunday, June 4. Work will begin at 7 AM on Sunday, through the overnight hours on Monday, June 5. Mass Ave will remain open during the operation. Paving is tentatively scheduled for Sunday, June 11.
- Later this week, crews will construct a raised crosswalk on Mass Ave at Arlington St (Thursday, June 1).
____________________________________________________________________________________________________________________________________________________________
May 15, 2017
- Crews will continue with sidewalk improvements on Mass Ave, in the section between Arlington St and Upland Rd. On Thursday, 5/18, crews will begin installing a new crosswalk across Mt Vernon St.
______________________________________________________________________________________________________________________________________________________
May 8, 2017
- Crews will continue sidewalk improvements on Mass Ave, between Lancaster and Arlington Sts this week.
______________________________________________________________________________________________________________________________________________________
May 1, 2017
Crews will resume sidewalk reconstruction on Mass Ave in the Lancaster St area this week.
______________________________________________________________________________________________________________________________________________________
April 24, 2017
Crews will resume reconstructing sections of sidewalk on Mass Ave between Lancaster St and Arlington St on Monday, May 1. We apologize for the delay.
______________________________________________________________________________________________________________________________________________________
April 14, 2017
On Saturday, April 15th, the city’s contractor, Newport Construction, will be on site to pave the raised crosswalk across Lancaster Street at Mass Ave. Work hours will be 9am-2pm on Saturday.
Crews will be able to complete the work from Lancaster St. and this is not anticipated to affect traffic on Mass Ave. After the completion of the paving, Lancaster Street will be reopened for the remainder of the long weekend.
What to Expect During Construction:
- General work hours will be 9AM to 2 PM on Saturday.
- “No Parking” signs will be posted at least 24 hours in advance of construction; please be sure to check posted signs for exact dates and times.
- When work occurs directly in front of driveways or entryways, the contractor will coordinate access directly with businesses and residents.
Information or Assistance:
For information or assistance during this work, please contact Carl Howard of Newport Construction at 603-765-2882. In case of an emergency after hours or on weekends, please call the 24-Hour line at 617.349.4800.
Thank you for your patience during this construction. We hope you enjoy these improvements once they are complete.
April 10, 2017
Crews will mobilize to Mass Ave at Lancaster to begin surface improvements. They will replace sections of deteriorating sidewalks and pedestrian ramps.
_________________________________________________________________________________________________________________________________________________
April 3, 2017
Due to unfavorable weather conditions, crews will now mobilize during the week of April 10.
___________________________________________________________________________________________________________________________________________________
March 30, 2017
Crews are scheduled to mobilize on Mass Ave, between Linnaean St and Upland Rd, during the week of April 3 to begin surface improvements. All drainage work is complete.