The following are standard details for construction of public infrastructure in the City of Cambridge. Please contact the Information Desk at 617-349-4811 for additional information.
All Details - PDF Complete Set as of 2/15/2022 (6.1MB PDF)
All Details - CAD Format Complete Set as of 2/15/2022 (15.0MB ZIP)
Structures
Detail Title |
Download Links |
Single Grate Catch Basin |
|
Double Grate Catch Basin |
|
Drop Inlet Catch Basin - Plan |
|
Drop Inlet Catch Basin - Section |
|
Type 3 and 4 Catch Basin |
|
Doghouse Manhole 1 |
|
Doghouse Manhole 2 |
|
Sump Manhole |
|
Manhole General Notes |
|
Box Culvert Section 1 |
|
Box Culvert Section 2 |
|
Storage Tank Section 1 |
|
Storage Tank Section 2 |
|
Pipe
Detail Title |
Download Links |
Saddle Connection |
|
Tee Connection |
|
Chimney Connection |
|
Flexible Sleeve Connection |
|
Pipe Connection Materials Table |
|
Cast-In-Place Field Closure |
|
Pipe Wall Sleve Closure |
|
Utility Crossing |
|
Water Main Crossing |
|
Trench Detail |
|
Trench Dam Detail |
|
Sidewalk
Detail Title |
Download Links |
Brick Sidewalk - Plan |
|
Brick Sidewalk - Section, Asphalt Base |
|
Brick Sidewalk - Section, Concrete Base |
|
Curb Section - Bituminous Concrete |
|
Curb Section - Sloped Granite |
|
Curb Section - Vertical Granite |
|
Driveway Apron - Bituminous |
|
Driveway Apron - Brick |
|
Driveway Apron - Concrete |
|
Parking Meter Post Installation |
|
Sidewalk Expansion Joint |
|
Pavement
Detail Title |
Download Links |
Trench Patch |
|
Cold Plane and Overlay Joint |
|
Full Depth Joint |
|
Raising of Castings |
|
Crosswalk Markings |
|
4-Way Raised Intersections - Bus and Residential |
|
Pavement Transition |
|
Raised Cross Walks - Side Streets |
|
Raised Cross Walks - Ramp Marking |
|
Common Manhole Separation
Detail Title |
Download Links |
Storm Drain Bypass |
|
Sanitary Bypass |
|
Convert to Drain Manhole |
|
Convert to Sanitary Manhole |
|
End of Line Manhole |
|
Traffic Management
Detail Title |
Download Links |
Pedestrian Bypass |
|
Cyclist Accommodations |
|
Single Lane Closure |
|
Interior Lane Closure |
|
One-Lane Bi-Directional |
|
Two-Way Alternating Traffic |
|
Two-Way Lane Shift |
|
Signage Chart |
|
;General Notes /Legend |
|
Trees
Detail Title |
Download Links |
Tree Details 2022.02.15 |
|
02910 Tree Planting Cambridge 2022 |
|
Chapter 90 02910 Tree Planting 2022 |
|
Proper Tree Planting 2022 |
|
Erosion Control
Detail Title |
Download Links |
Construction Best Management Practices |
|
Catch Basin Protection 1 |
|
Catch Basin Protection 2 |
|
Catch Basin Protection 3 |
|
Catch Basin Protection 4 |
|
Catch Basin Protection 5 |
|
Construction Entrance |
|
Erosion and Sediment Control Notes |
|
Fiber Role Temporary Stockpile Protection |
|
Silt Fence |
|
Super Silt Fence |
|
Survey
Detail Title |
Download Links |
Boundary Monument |
|
Fence
Detail Title |
Download Links |
Chain Link Fence 1 |
|
Chain Link Fence 2 |
|
Concrete
Detail Title |
Download Links |
Wire Fabric Detail |
|
Epoxy Dowell Detail |
|
Disclaimer
These Standard Specifications, Guidelines, and Standard Details have been prepared as a service and accommodation to City staff, engineers, developers, utility companies, contractors, and/or other interested parties doing work in the City of Cambridge, MA. The information is offered in good faith and is believed to be accurate at the time of its preparation and is provided without any warranty, expressed or implied. It is not intended to be site or project specific, and the user is advised to exercise appropriate engineering and construction judgment, knowledge, and experience in applying all or a portion of these documents for a specific project. Where necessary, additional engineering, construction, legal, or other expert support may be required and should be sought.
The City of Cambridge assumes no responsibility or liability associated with the use or intended use of these documents. The use of these documents shall in no way relieve the user of its responsibility in performing to the applicable standard of care in preparing, applying, and implementing such documents.
It should be understood that these documents are not intended to address all possible areas/types of construction within Cambridge. Any deviations, changes, modifications, revisions, or supplemental documents shall be reviewed by Cambridge Department of Public Works Engineering Division prior to construction.
The user shall be responsible for verifying the most recent version of these documents prior to such use.
These documents shall only be used on a City of Cambridge project, as applicable. Any use or misuse of these documents is subject to legal enforcement/action by the City of Cambridge.