U.S. flag

An official website of the United States government

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Partial Roadway Paving Enhancements Scheduled beginning week of April 22

Photo of two construction cones with construction workers in the background

Beginning April 22, weather permitting, the City's contractor, EJ Paving, will be performing partial roadway grinding and paving operations to enhance the road conditions on several sections of streets around the City.  The Roadway grinding operation at each location is expected to take two days followed by paving of the roadway later that same week, or the following week, weather permitting.  For a list of street sections to be resurfaced, please see below.

Due to the nature of this work and the scale of each paving job, specific work dates on your street are not available.  However, please be sure to watch for NO PARKING SIGNS, posted 24 hours in advance, which will indicate the exact location and dates when work will take place.  Residents who have vehicles parked in the project area will need to move them prior to 7 a.m.

List of street sections to be resurfaced beginning April 22: (Please note, the entire street will not be repaved, just a section within the limits listed)

  • Old Dee Rd
  • Worthington St
  • Vassal Lane
  • Holly Ave
  • Orrin St
  • Tierney St
  • Winslow St
  • Van Norden St
  • Exeter Park
  • Sacramento St
  • Wendell St
  • Mellen St
  • West St
  • West Pl
  • Inman Pl
  • Broadway Terrace

List of street sections to be resurfaced in May:

  • Ellery St
  • Cowperthwaite St
  • Surrey St
  • Howard St
  • Columbia St (Hampshire St to Cambridge St)
  • Lincoln St
  • Windsor St
  • Webster Ave
  • Columbia St (Bishop Allen Drive to Broadway)

What to Expect During Construction:

  • General work hours will be 7 a.m. - 4 p.m.
  • Emergency vehicles and City Services will have access at all times.
  • Police officers will be onsite to assist with traffic management.
  • Crews will make every effort to open the roadway as soon as possible.
  • The road will be closed, but abutters will maintain access.

Information and Assistance:

If you have any questions about the paving operations or need assistance, including any special needs or disabilities that require a special accommodation, please contact Paul Almeida, Construction Utility Inspector at 617-349-6953.  

 

 

 

Page was posted on 4/16/2024 3:36 PM
Page was last modified on 4/16/2024 3:41 PM
Contact Us

How can we help?

Please provide as much detail below as possible so City staff can respond to your inquiry:

As a governmental entity, the Massachusetts Public Records Law applies to records made or received by the City. Any information received through use of this site is subject to the same provisions as information provided on paper.

Read our complete privacy statement


Service Requests

Enter a service request via SeeClickFix for things like missed trash pickups, potholes, etc., click here