Older Bicycle Facility Projects

The City of Cambridge continually evaluates locations where large and small scale bicycle infrastructure improvements can be made to increase safety and meet our Vision Zero goals. This page highlights older completed bicycle facility improvement projects, but it is not an exhaustive summary of all bicycle improvements. To see more recently completed bicycle facility projects, click here.

Click on an image below for a larger picture of that project. For descriptions on the different types of bicycle facilities, click here. For a map view of the City's current and planned bicycle facilities, click here.

2019

Bike Paths

Discovery Park path square
Discovery Park Path

Separated Bike Lanes

Main separated square
Main St eastbound from Broadway to Memorial Dr
Craigie Bridge separated square
Charles River Dam Rd from Museum Way to Nashua St
King Open separated square
Cambridge St eastbound from Willow St to Berkshire St
Broadway separated square
Galileo Galilei Way northbound north of Broadway
Broadway separated square
Broadway westbound from Ames St to Galileo Galilei Way

Bike Lanes

James contraflow square
James St contra-flow from Mason St to Brattle St
Mass Ave bike lane Chancy to Waterhouse square
Mass Ave southbound from Chauncy St to Waterhouse St
Kirkland bike lane square
Kirkland St eastbound from Oxford St to Quincy St

Shared Lane Markings

Phillips Place SLM square
Berkeley St/Phillips Pl from Garden St to Mason St
Dover SLM square
Dover St from Somerville Line to Mass Ave

Other Marking/Facility Improvements

ride here to be counted Broadway square
"Ride Here to be Counted" at Broadway Eco-Totem
Stop here on red Mass Ave square
"Stop Here on Red" at Mass Ave @ Vassar St northbound
145 Broadway protected intersection square
Partial protected intersection at Broadway/Galileo Galilei Way around 145 Broadway
 little Mass Ave square
Little Mass Ave floating parking and buffer
 Mass at Prospect bike box square
Bike box at Mass Ave @ Prospect St

2018

South Massachusetts Avenue Corridor Safety Improvements Project

The South Massachusetts Avenue Corridor Safety Improvements Project was a "quick-build" project on Massachusetts Avenue between Sydney Street and Memorial Drive focusing on safety and accessibility, and features separated bike lanes in both directions for the majority of the corridor. Other changes include:

  • Signal timing changes at intersections to reduce conflicts and crashes
  • Sections of bus lane toward Memorial Drive
  • A new crosswalk across Massachusetts Avenue at Windsor Street, completed in 2020. 

Bike Paths

kittie knox bike path thumbnail
Kittie Knox Bike Path

Separated Bike Lanes

one broadway grade separated thumbnail
Main St and Third St around One Broadway
cambridgepark dr eastbound grade separated thumbnail
Cambridgepark Dr eastbound
Ames St two-way separated bike lane
Ames St from Broadway to Main St

Bike Lanes

Garden St bike lane
Garden St westbound from Concord Ave to Huron Ave
mass ave bigelow to lee bike lane thumbnail
Mass Ave westbound from Bigelow St to Lee St
Mt Auburn St bike lane
Mt. Auburn St westbound from Brattle St to
Belmont St
Belmont St bike lane 
Belmont St northbound from Mt. Auburn St to Belmont Line
Cameron Ave bike lane thumbnail
Cameron Ave northbound from Mass Ave to Somerville Line

Shared Lane Markings

Garden St SLM thumbnail
Garden St eastbound from Huron Ave to Concord Ave
Brattle St SLM thumbnail
Brattle St from Craigie St to Mason St
Fulkerson St SLM thumbnail
Fulkerson St from Charles St to Binney St
Inman St SLM thumbnail 
Inman St from Hampshire St to Broadway
Mt Auburn St eastbound SLM thumbnail
Mt. Auburn St eastbound from Belmont St to
Coolidge Ave
Mt Auburn St westbound SLM thumbnail
Mt. Auburn St westbound from Coolidge Ave to
Brattle St

Improvements to Existing Facilities

For More Information

For more information about bicycle projects and bicycling in Cambridge, please contact cddat344@cambridgema.gov.