Broadway Safety Improvement Project

The City of Cambridge is installing separated bike lanes on Broadway between Quincy St and Portland St.

What to expect:

  • Installation of separated bike lanes: This refers to bike lanes along the curb, separated from vehicles by white flex-posts or other physical barriers.

  • Changes for people walking and taking the bus: Bus stop locations may change, and pedestrian safety enhancements will improve crosswalks.

  • Reduce on-street parking

    • We haven't finished design yet, but we hope to maintain about 40% of the current spaces.
    • The amount of parking that remains will depend on which design options we choose during the community feedback process and will vary by location.

These changes will help us meet the requirements of the Cambridge Cycling Safety Ordinance, support our Vision Zero goal to eliminate crashes resulting in fatalities and serious injuries, and bring us closer to realizing the Cambridge Bicycle Network Vision.

Plans

Below are the revised Section A Plans. These plans take into account additional community feedback, and are revised since our previous plans shared in January, 2025. Click here to view the plans in a larger format.

 

Surveys

We want to hear from you! 

Comment Map

Tell us how you currently use the street, pinpoint safety concerns, and identify parking and loading needs.

Comment

Comment Form

Have a general comment that isn't location based?

Share Your Thoughts


Project Sections

This project is broken into three sections. Right now, we are in Section A: Portland Street to Columbia Street.


Section A (We're Here)
Portland Street to Columbia Street
This includes the eastern most section of the project. This section is under design. We anticipate designing the project in Winter of 2025, with installation later in 2025.
Installation Timeline: 2025
Project Status: Installation Underway
Section B
Columbia Street to Ellery St
We have not yet begun design of Broadway west of Columbia St. We expect to have a design in early 2026, with installation later in 2026.
Installation Timeline: 2026
Project Status: Not Yet Started
Section C (We're Here)
Ellery St to Quincy Street
We have not yet begun design of Broadway west of Columbia St. We expect to have a design in early 2026, with installation later in 2026.
Installation Timeline: 2026
Project Status: Design Underway

Installation Updates

Week of June 16 (Daytime Hours):
  • Sign work: Parking signs will be changed to reflect the plans. Click here to view the plans.
  • Converting two resident parking spaces to metered parking in front of the businesses near Clark Street.
  • Converting two meters to a loading zone at Broadway and Moore Street.
  • Converting a loading zone to metered parking across from Davis Street.
  • Adding accessible/disability parking near Fletcher-Maynard Academy.

Week of June 23 (Daytime Hours):

  • We will move the IB bus stop at Windsor Street to its new location across the street.
  • The new stop location will be posted two weeks in advance of the change.
  • MBTA will add an alert of the change to its website.

Future Overnight Work:

  • Pavement markings will be installed either the week of June 23 or June 30, depending on weather and crew availability. Click here to view the email update sent to the project mailing list

 

Upcoming Events

Past Events

Outreach and Surveys

More Project Information

Data

Policy and Design Background

Contact Us

How can we help?

Please provide as much detail below as possible so City staff can respond to your inquiry:

As a governmental entity, the Massachusetts Public Records Law applies to records made or received by the City. Any information received through use of this site is subject to the same provisions as information provided on paper.

Read our complete privacy statement


Service Requests

Enter a service request via SeeClickFix for things like missed trash pickups, potholes, etc., click here